HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-483-2019
Submission Date : 10-06-2019 11:27:44 AM
Applicant Type : Company
Project Type: ONGOING




MODEL ECONOMIC TOWNSHIP LIMITED
3RD FLOOR, 77-B, IFFCO ROAD, SECTOR-18, GURGAON-122015, HARYANA, INDIA
01244827369
9871212564 (Number Shared by Promoter in Public)
ajay.nijhawan@ril.com
http://www.modeleconomictownship.com
XXXX037Q
U70109HR2006PLC036416
 
 


 
 


 
 


 
 


 
 


 
 







INDUSTRIAL COLONY OF 284.131 ACRES
DADRI TOI, SHEOJIPURA, BIR DADRI
BADLI
JHAJJAR
01243527375
9871212564 (Number Shared by Promoter in Public)
ajay.nijhawan@ril.com
ANIL SHARMA
01243527331
9910021132 (Number Shared by Promoter in Public)
anil.sharma@ril.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
127310827-07-20175584775HDFC BANKHRERA Panchkula
238490026-12-2017164404HDFC BANKHRERA Panchkula







284.131 (Acre)
NA
0
284.131 (Acre)
19 OF 2011 (14.03.2011) 07 OF 2012 (01.02.2012) 08 OF 2016 (26.07.2016) 107 OF 2017 (22.12.2017)
Yes







29362 Lakhs
17515 Lakhs
0 Lakhs
10963 Lakhs
885 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD173.8478
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS56.073
4PAVEMENTS0
5PARKS AND PLAYGROUNDS5.9339
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13PUBLIC UTILITIES SUCH AS STP ESS ETC35.1463
Total271.001




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSPWD, JHAJJAR AS PER SERVICE PLAN ESTIMATEYes
WATER SUPPLYCGWAYes
ELECTRICITYHVPNL & UHBVN;Yes
SEWAGE DISPOSALPLEASE REFER SERVICE PLAN ESTIMATEYes
STORM WATER DRAINAGEPLEASE REFER SERVICE PLAN ESTIMATEYes
LAYOUT PLANDGTCP, HARYANAYes
LICENSE FOR PROJECTDGTCP, HARYANAYes
ZONING APPROVALDGTCP, HARYANAYes
SERVICE PLAN ESTIMATEDGTCP, HARYANAYes
ENVIRONMENTAL CLARANCEMOEFYes
CTE PERMISSIONHARYANA STATE POLLUTION CONTROL BOARDYes
CONVEYANCE OF WATER TO SITE FROM NCR CHANNELIRRIGATION DEPARTMENTYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1716739577.84AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM209011674.62AS PER PROJECT REPORT
3STORM WATER DRAINAGE169846936.87AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM358310949.23AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL46330236.49AS PER PROJECT REPORT
6STREET LIGHTING20500004.69YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15HORTICULTURE11226696.79AS PER PROJECT REPORT
16STATUTORY CHARGES 98086225.64AS PER PROJECT REPORT
17CONSULTANCY FEE GATE COMPLEX ETC332613856.94AS PER PROJECT REPORT


NA (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1PLOT Type IND74.741000
2PLOT Type IND32.001000
3PLOT Type IND18.39151000
4PLOT Type IND10.01000
5PLOT Type IND5.01000
6PLOT Type IND2.01000
7PLOT Type IND0.941000
8PLOT Type IND0.51000
9PLOT Type IND0.2548000
10PLOT Type COMM1.03411000
11PLOT Type COMM1.16321000
12PLOT Type COMM1.53971000
13PLOT Type COMM2.48251000
14PLOT Type COMM1.98001000
15PLOT Type GROUP HOUSING2.01000
16PLOT Type GROUP HOUSING2.01000
17PLOT Type GROUP HOUSING2.01000
18PLOT Type GROUP HOUSING2.011000
19PLOT Type GROUP HOUSING2.211000






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
NA0NA


15-06-2017
30-09-2022
30-09-2022
15-06-2017
42.50
30-09-2022
DETAILED PROVIDED
DETAILED WRITE UP ANNEXED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT36FEW PLOTS HANDED OVER.
15-06-2017
42.5
30-09-2022
DETAILS PROVIDED
DETAILS ANNEXED


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1030
Water Supply System1450
Sewerage treatment & garbage disposal990
Electricity Supply System2390
Storm Water Drainage850
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other60

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements103103103103
Water Supply System145145145145
Sewerage treatment & garbage disposal99999999
Electricity Supply System239239239239
Storm Water Drainage85858585
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other6666

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements103103103103
Water Supply System0145145145
Sewerage treatment & garbage disposal09900
Electricity Supply System239239239239
Storm Water Drainage0858585
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other6066
Consultancy fee and Gate complex etc0
Horticulture0
Statutory charge6

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements44103103103
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System02392390
Storm Water Drainage0000
Parks and Playgrounds1010100
Clubhouse/community centres00010
Shopping area0000
Other6666

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements44444444
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds10101010
Clubhouse/community centres0000
Shopping area0000
Other6666

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements4444
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds100
Clubhouse/community centres00
Shopping area00
Other60












Particulars Remarks, if any
i. No. of Flats/Apartments constructed66This is the total no of plots available
ii. No. of Flats/ Apartments booked36Pertaining to plots
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter31627 LakhsPertaining to plots booked
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter11839 LakhsPertaining to plots booked till 31.12.17
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter19788 Lakhsbalance amount to be collected as given in the application already submitted.
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 LakhsAs mentioned in item V above
vii. Amount invested in the project upto the date of application22550 LakhsIncluding land value
Land cost (If any)17515 Lakhs
Apartments0 Lakhs
Infrastructure4260 Lakhs
EDC/ Taxes Etc.775 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession6812 Lakhs
(a) In respect of existing allottees0 LakhsNA
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 LakhsNA
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 LakhsNA



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS36462102
II. WATER SUPPLY SYSTEM1717554
III. STORM WATER DRAINAGE942263
IV. ELECTRICITY SUPPLY SYSTEM36971064
V. SEWAGE TREATMENT & GARBAGE DISPOSAL795199
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.16578
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT885775









Yes
Yes
HDFC BANK, VATIKA ATRIUM, BLOCK A, KHASRA NO.1741/1742/1743,VILLAGE WAJIRPUR, GURGAON
05720310000791
HDFC0000572
110240093
HDFC0000572
Gagan Agarwal and Sudhir Jain 3rd floor 77B sector18 IFFCO road Gurugram 122015
Uploaded











Yes
Yes
Yes
No
Yes
No
No
No
No
No


Yes
Yes
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE FOR 284.131 ACRESALREADY BEEN OBTAINED22-12-2017
II. ZONING APPROVALS FOR 284.131 ACRES (INDUSTRIAL PLOT)ALREADY BEEN OBTAINED19-05-2017
III. ZONING APPROVALS FOR 284.131 ACRES (COMMERCIAL PLOT & AFFORDABLE HOUSING PLOT)ALREADY BEEN OBTAINED18-01-2018
IV. ZONING APPROVALS FOR 284.131 ACRES (31.55 ACRES WAREHOUSE PLOT)ALREADY BEEN OBTAINED07-02-2018
V. SERVICE PLAN ESTIMATEALREADY BEEN OBTAINED16-05-2017
VI. ACCESS FROM SH 15AALREADY BEEN OBTAINED24-02-2011
VII. ACCESS FROM SH 15AALREADY BEEN OBTAINED22-12-2017
VIII. ELECTRIFICATION PLANALREADY BEEN OBTAINED22-05-2016
IX. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED24-08-2012
X. CTE PERMISIONALREADY BEEN OBTAINED08-11-2012
XI. WATERALREADY BEEN OBTAINED08-10-2016
XII. GROUND WATER FROM CGWAALREADY BEEN OBTAINED24-11-2014
XIII. CONVEYANCE OF WATER TO SITE FROM NCR CHANNELALREADY BEEN OBTAINED08-09-2016
XIV. ENVIRONMENTAL CLEARANCEAPPLIED FOR BUT YET TO RECEIVE13-10-2017








No


Yes


NA







INDUSTRIAL COLONY OVER 276.006 ACRES IN VILLAGE DADRI TOE SHEOJIPURA AND BIR DADRI TEHSIL BADLI DISTRICT JHAJJAR
276.006
0
66
0
66
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11592118475035
Cost of the apartments000
Cost of the infrastructure11592118475035
Others costs000


11839 Lakhs
19788 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2022
30-09-2022




INDUSTRIAL PLOTTED COLONY OVER 88.725 ACRES IN VILLAGE DADRI TOE TEHSIL BADLI DISTRICT JHAJJR
88.725
0
9
0
9
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
372637261161
Cost of the apartments000
Cost of the infrastructure372637261161
Others costs000


4224 Lakhs
4722 Lakhs
0 Lakhs
0 Lakhs
No
28-06-2020
28-06-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND16-04-2019 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN18-04-2019 View Document
3ZONING PLAN18-04-2019 View Document
4DEMARCATION PLAN18-04-2019 View Document
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN19-04-2019 View Document
6COPY OF REGISTRATION CERTIFICATE (CERTIFICATE OF INCORPORATION)19-04-2019 ------
7MEMORANDUM OF ASSOCIATION19-04-2019 ------
8BOARD RESOLUTION19-04-2019 ------
9REP II FORM19-04-2019 ------
10AMOUNT TO BE COLLECTED FROM ALLOTTEES FOR 88.725 ACRES PROJECT19-04-2019 ------
11INITIAL & LIKELY SCHEDULE OF COMPLETION OF 276.006 ACRES PROJECT19-04-2019 ------
12INITIAL & LIKELY SCHEDULE OF COMPLETION OF 88.725 ACRES PROJECT19-04-2019 ------
13ELECTRIFICATION SUPPLY PLAN19-04-2019 ------
14PROJECT GUIDE MAP19-04-2019 ------
15AMOUNT TO BE COLLECTED FROM ALLOTTEES FOR 276.006 ACRES PROJECT19-04-2019 ------
16ROAD AND PAVEMENT PLAN19-04-2019 ------
17DRAFT AGREEMENT WHICH SHALL BE MADE BEFORE SEEKING ANY DEPOSIT EXCEEDING 10%19-04-2019 ------
18WATER SUPPLY PLAN19-04-2019 ------
19STORM WATER DRAINAGE PLAN19-04-2019 ------
20SEWERAGE NETWORK19-04-2019 ------
21COPY OF BALANCE SHEET OF LAST 3 YEARS04-06-2019 ------
22NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT04-06-2019 View Document
23IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN10-06-2019 View Document
24CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT09-05-2019 View Document
25DRAFT OF REGISTRATION FEE07-06-2019 ------
26CASH FLOW STATEMENT OF THE PROPOSED PROJECT07-06-2019 View Document
27DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.07-06-2019 View Document
28DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD10-06-2019 View Document
29A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS10-06-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 CORRIGENDUM 23-05-2022 View Document
2 AMENDMENT IN REGISTRATION CERTIFICATE 20-03-2020 View Document
3 Corrigendum Uploaded 03-03-2023 View Document
4 Extension uploaded 25-07-2023 View Document
5 PCC FOR AREA 258.44 ACRE GRANTED 28-12-2023 View Document
6 Part Completion Certificate Uploaded. 16-01-2024 View Document