HRERA GurugramTemp Project Id : RERA-GRG-PROJ-146-2019
Submission Date : 11-10-2019 04:10:06 AM
Applicant Type : Company
Project Type: ONGOING




IDENTITY BUILDTECH PVT. LTD.
110, INDRAPRAKASH, 21, BARAKHAMBA ROAD, NEW DELHI-110001
01203854152
9718407818 (Number Shared by Promoter in Public)
karun.ansal@ansals.com
http://www.ansals.com
XXXX096A
U45200DL2006PTC153603
 
 


 
 


 
 


 
 







ANSALS HIGHLAND PARK
SECTOR- 103, GURUGRAM
GURGAON
GURUGRAM
01204195271
9650028884 (Number Shared by Promoter in Public)
RERA@ANSALS.COM
NETRAPAL SHARMA
01203854128
9650028884 (Number Shared by Promoter in Public)
Netrapal.Sharma@ansals.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
124996728-07-2017827700.00AXIS BANK LTD.HRERA Gurugram
22285318-12-2018629354.00AXIS BANK LTD.HRERA Gurugram
32351127-02-2019826273AXIS BANK LTD.HRERA Gurugram







47348.145 (Sqr/mtrs)
82859.254
175
47348.145 (Sqr/mtrs)
32 of 2012
Yes







39552.76 Lakhs
10384.94 Lakhs
17560.75 Lakhs
1525.01 Lakhs
10082.06 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS6211.671
3CONSTRUCTION OF ROADS10587.10
4PAVEMENTS295.596
5PARKS AND PLAYGROUNDS9463.403
6GREEN BELTS3047.81
7VEHICLE PARKINGS3062.50
8ELECTRICITY SUB-STATION521.95
9CLUB HOUSE193.209
10SEWAGE AND SOLID WASTE TREATMENT FACILITY354.678
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER13128.262
13NURSERY218.898
14COMMERCIAL263.068
Total47348.145




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDANo
ELECTRICITYDHBVNNo
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS142.29YET TO BE PREPARED
2WATER SUPPLY SYSTEM184.62YET TO BE PREPARED
3STORM WATER DRAINAGE80YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM404.98YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL94YET TO BE PREPARED
6STREET LIGHTING18YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING355.16YET TO BE PREPARED
8PLAYGROUNDS AND PARKS25YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE50.96YET TO BE PREPARED
10SHOPPING AREA38.34YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM2YET TO BE PREPARED
12SCHOOL56.86YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER72.8YET TO BE PREPARED


16-04-2013 (date)
16-04-2013 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+1ROOM+UTILITY138.124323111
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+UTILITY112.917216175412
3APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK98.857288228604
4APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK75.268847681
5APARTMENT/SHOPS/OTHER BUILDINGS Type EWS16.3211011001
6APARTMENT/SHOPS/OTHER BUILDINGS Type CONVENIENT SHOP136.658801
7APARTMENT/SHOPS/OTHER BUILDINGS Type NURSERY SCHOOL381.4191101






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
3BHK+1ROOM+UTILITY3164%
3BHK+UTILITY17546.5%
3BHK22861%
2BHK7666%
EWS1102%
CONVENIENT SHOP80%
NURSERY SCHOOL10%


18-04-2013
18-04-2017
30-11-2021
18-04-2017
0
30-11-2021


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
18-04-2017
0
30-11-2021


693
10
0
245
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments11184.62
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0589.62609.73480.84
Shops0000
Plots0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments422.55361.78367.15371.50
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments427.97425.41386.79394.90
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments467.850368.99420.52280.53
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System505052.12
Sewerage treatment & garbage disposal000
Electricity Supply System152525
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres4.54.55
Shopping area444
Other000
Rainwater Harvesting101010
STP15

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2020.52020
Water Supply System0000
Sewerage treatment & garbage disposal0003
Electricity Supply System25252525
Storm Water Drainage0885
Parks and Playgrounds0055
Clubhouse/community centres555.55.5
Shopping area4444
Other0000
Electrical sub station20.52020
Security and Fire fighting services50755050
STP10101010
School010515
Underground tank8
Rainwater Harvesting12
Electrical Sub Station20

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements202120.79
Water Supply System000
Sewerage treatment & garbage disposal333.74
Electricity Supply System303037.69
Storm Water Drainage575
Parks and Playgrounds555
Clubhouse/community centres5.9655
Shopping area3.343.53.5
Other12.83030
STP10106.26
Security and Fire fighting services504040.16
Street Light666
Underground tank888.5
Electrical sub station202120.79
School159.142.72
Renewable energy system2












Particulars Remarks, if any
i. No. of Flats/Apartments constructed730
ii. No. of Flats/ Apartments booked620
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter43327.40 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter34430.30 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter8897.10 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter8897.10 Lakhs
vii. Amount invested in the project upto the date of application27053.99 Lakhs
Land cost (If any)10384.94 Lakhs
Apartments17560.75 Lakhs
Infrastructure1525.01 Lakhs
EDC/ Taxes Etc.10082.06 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession12498.77 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
9000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS142.290
II. WATER SUPPLY SYSTEM152.120
III. STORM WATER DRAINAGE380
IV. ELECTRICITY SUPPLY SYSTEM262.690
V. SEWAGE TREATMENT & GARBAGE DISPOSAL12.740
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL56.860
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE50.960
XI. NEIGHBOURHOOD SHOPPING38.340
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.250
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM355.160
XVII. OTHER FACILITIES AS PER PROJECT REPORT390.850









Yes
Yes
AXIS BANK LTD., NEW DELHI MAIN BRANCH
913020005621027
UTIB0000007
110211002
000007
Tarun Kathuria 252, Dhudhial Appartment, Madhuban Chock, Near Pitam Pura Metro Station, Sarasvati Vihar, North West Delhi –110034
Yes attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. COMMENCEMENT CERTIFICATE MEMO NO. ZP-851/AD(RA)/2013/36610 DATED 16/04/2013ALREADY BEEN OBTAINED16-04-2013
II. FOREST NOC NO.78-G DATED 02/04/2013ALREADY BEEN OBTAINED02-04-2013
III. AIRPORT HEIGHT CLEARANCE NOC NO. AAI/RHQ/NR/ATM/ NOC/REVALIDATION/ 2013/09/1459-63 DATED 18/09/2017ALREADY BEEN OBTAINED18-09-2017
IV. HUDA CONSTRUCTION WATER NOC MEMO NO. 100 DATED 08/01/2013ALREADY BEEN OBTAINED08-01-2013
V. FIRE SCHEME APPROVAL MEMO NO. DFS/FA/2014/ 16258 DATED 31/03/2014ALREADY BEEN OBTAINED31-03-2014
VI. LICENSE NO-32 OF 2012 DATED 12/04/2012 - VALID TILL 11/04/2016 APPRLIED FOR RENEWALS ALREADY BEEN OBTAINED12-04-2012
VII. ENVIRONMENTAL CLEARANCE SEIAA/HR/2013/946 DATED 15/10/2013ALREADY BEEN OBTAINED15-10-2013
VIII. CONSENT TO ESTABLISH NO. HSPCB/ CONSENT/: 2821214GUNOCTE734647 DATED 02/06/2014ALREADY BEEN OBTAINED02-06-2014
IX. MINING PERMISSION PERMIT NO: 1295, MEMO NO.883 DATED 29/04/2013 ISSUED BY ASSISTANT MINING ENGINEER GURUGRAMALREADY BEEN OBTAINED29-04-2013
X. ELECTRICAL LOAD AVAILABILITY APPLIED FOR BUT YET TO RECEIVENA
XI. SERVICES ESTIMATES AND PLANS APPLIED FOR BUT YET TO RECEIVENA








Yes


Yes


Completion date is Nov, 2021.







AANSALS AMANTRE SECTOR 88A GURUGRAM
332552
487
0
487
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
12554125546965
Cost of the apartments640264022384
Cost of the infrastructure838331
Others costs606960694550


8566 Lakhs
5394 Lakhs
7700 Lakhs
6033 Lakhs
No
31-12-2022
31-12-2022




ANSAL TOWN YAMUNA NAGAR PHASE - II
21.43
0
178
0
178
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
491749171939
Cost of the apartments000
Cost of the infrastructure275275114
Others costs639863984044


3688 Lakhs
388 Lakhs
3180 Lakhs
2385 Lakhs
No
31-12-2021
31-12-2021




ANSAL BOULEVARD GURUGRAM
2.80
637
0
637
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
669166914237
Cost of the apartments433743372229
Cost of the infrastructure339339189
Others costs639863984044


9612 Lakhs
6245 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2020
31-12-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE
2WALL FINISHING DETAILSPLASTER WITH OBD
3KITCHEN DETAILSGRANITE COUNTER WITH TILE DADO
4BATHROOM FITTINGSPARRAYWARE/CERA CHINA WARE AND JAQUAR FITTING OR EQUIVALENT
5WOOD WORK ETCNO WOOD WORK
6DOORS AND WINDOS FRAMESWOODEN DOOR FRAMES & LAMINATED DOOR SHUTTERS & UPVC WINDOW
7GLASS WORKUPVC GLAZED WINDOW SHUTTER
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSPVC CONDUIT AND FRLS WIRE
10CUPBOARD DETAILSONLY NITCH PROVIDED AS/DRAWING
11WATER STORAGEOHT/UGT AS PER NORMS
12LIFT DETAILSHIGH SPEED LIFT
13EXTERNAL GLAZINGSNO
13.1WINDOWS/GLAZINGSYES
14DOORSLAMINATED DOOR
14.1MAIN DOORSLAMINATED DOOR
14.2INTERNAL DOORSLAMINATED DOOR
15AIR CONDITIONINGNO
16ELECTRICAL FITTINGSONLY IN COMMON AREAS
17CNG PIPE LINENO
18PROVISION OF WIFI AND BROADBAND FACILITYNO
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER PROOF TEXTURE FINISH AS/COLOUR SCHEME
20INTERNAL FINISHINGPLASTER WITH OBD PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE
1 . 2 WALLSPLASTER WITH OBD
1 . 3 CEILINGPLASTER WITH OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FINISH VITRIFIED TILE
2 . 2 WALLSPLASTER WITH OBD
2 . 3 CEILINGPLASTER WITH OBD
2 . 4 MODULAR WARDROBESNO
3 . MASTER TOILET
3 . 1 FLOORANTI SKID CERAMIC TILE
3 . 2 WALLSDADO UP TO 7’ HEIGHT
3 . 3 CEILINGPLASTER WITH OBD
3 . 4 COUNTERSGRANITE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSPARRYWARE /CERA /JAQUAR OR EQUIVALENT MAKE
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILE
4 . 2 WALLSPLASTER WITH OBD
4 . 3 CEILINGPLASTER WITH OBD
4 . 4 WARDROBESNO
5 . TOILET
5 . 1 FLOORANTI SKID CERAMIC TILE
5 . 2 WALLSDADO UP TO 7’ HEIGHT
5 . 3 CEILINGPLASTER WITH OBD
5 . 4 COUNTERSGRANITE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSPARRYWARE/CERA/JAQUAR MAKE OR EQUIVALENT MAKE
5 . 6 FIXTURESNO
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE
6 . 2 WALLSPLASTER WITH OBD
6 . 3 CEILINGPLASTER WITH OBD
6 . 4 COUNTERSGRANITE COUNTER WITH 2’ HIGH DADO TILE
6 . 5 FIXTURESMODULAR KITCHEN
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILE
7 . 2 WALLS & CEILINGPLASTER WITH OBD
7 . 3 TOILETIWC WITH NECESSARY FITTINGS
7 . 4 BALCONYANTI SKID CERAMIC TILE
8 . SIT-OUTS
8 . 1 FLOORTILING
8 . 2 WALLS & CEILINGPLASTER WITH OBD
8 . 3 RAILINGSM.S. RAILING AS /DESIGN
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN28-02-2019 View Document
2CASH FLOW STATEMENT OF THE PROPOSED PROJECT28-02-2019 View Document
3CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT28-02-2019 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT28-02-2019 View Document
5DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD28-02-2019 View Document
6A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS28-02-2019 View Document
7COPY OF LICENSE ALONG WITH SCHEDULE OF LAND10-01-2019 View Document
8IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN12-01-2019 View Document
9DEMARCATION PLAN12-01-2019 View Document
10ZONING PLAN12-01-2019 View Document
11IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN12-01-2019 View Document
12DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.12-01-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 PROJECT CONTINUATION- RC/REP/HARERA/GGM/16 of 2019/7(3)/2022/15 DATED 20.12.2022 12-04-2023 View Document