Quarterly Schedules | ||
HRERA Panchkula | ||
Project Registration Number : HRERA-PKL-AMB-149-2019 | ||
Project Name : GREEN CIRCLE HOMES-VII | ||
Project Number : RERA-PKL-645-2019 | ||
Project Type : NEW | ||
Report Online Submission Date : 21-Jan-2020 |
S.No. | Particulars | Amount (In Lakhs) |
1 | Cost of the land (if included in the estimated cost) | 406.93 |
2 | Estimated cost of construction of apartments | 0 |
3 | Estimated cost of infrastructure & other structure | 336.44 |
4 | Other cost including EDC taxes, levies, etc | 262.51 |
Total | 1005.88 |
Name of the approval | Status | Date |
Layout Plan | Obtained Approval on | 20-03-2018 |
Demarcation Plan | Obtained Approval on | 01-05-2019 |
Zoning Plan | Obtained Approval on | 25-06-2019 |
Service Plans | Obtained Approval on | 16-08-2022 |
Electricity Plans | Obtained Approval on | 15-05-2023 |
Total Expenditure on the project | 336.44 |
Expenditure made upto the date of Registration | 5.996 |
EDC due as on the date of Registration | 0 |
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 4.50 |
5 | Any other receipt | 0 |
Total | 4.50 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 4.50 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 4.50 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 3.50 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 1.00 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 3.30 |
5 | Any other receipt | 0 |
Total | 3.30 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 3.30 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 3.30 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 3.00 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0.30 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 0 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 31.78 |
5 | Any other receipt | 0 |
Total | 31.78 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 0 |
2 | Expenditure on infrastructure & other structure | 31.78 |
3 | Other costs including EDC, taxes, etc | 0 |
Total | 31.78 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 0 |
3 | Amount withdrawn during the quarter | 0 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 202 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | RESIDENTIAL | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | N.A. | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | N.A. | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 29.20 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 2.58 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 109.51 |
2 | EDC due as on date | 0 |
|